☀ Solar Energy Planner · rooftop PV, solar farms and green roofs for Ghana
Find the roof or site on the map, lay out the modules, then run the feasibility case. Resilicity · v…
01 / SOLAR POTENTIAL
Your roof. A brighter possibility.
Find your building, explore panel layouts and estimate how much electricity your roof could generate.
02 / ENERGY RESILIENCE
Plan for the hours the grid goes quiet.
Match solar and battery storage to your electricity use. Explore bill savings and backup for the loads that matter.
03 / LIVING ROOFS
Generate power. Make room for green.
Explore solar alongside a living roof, from planting and rainwater storage to feasibility and EDGE screening.
ILLUSTRATIVE DESIGN VISUALS
From a rooftop idea to an informed plan.Ghana-focused solar, storage and green-roof feasibility · by Resilicity
⚠ Feasibility-level estimates. Tariffs, costs, yield and climate normals are sourced or flagged (see the Data tab); layouts are screening plans, not construction drawings; green-roof performance is transferred from FLL/tropical literature with no Ghana field data.
📍 Site & PV layout
🏠 Roof faces
☀ Solar PV economics
🌿 Green roof
💰 Bill of quantities
🏅 EDGE credits
📋 Data provenance
📖 Knowledge centre
Search, then click a building (roof) or draw the boundary.
Enter the site by coordinates or dimensions
Rearrange manually
0 selected
Click modules on the map to remove or restore them; hand-placed modules are not checked against edges or obstacles.
12:00
Drag to move · right-drag (or hold Ctrl and drag) to turn and tilt · scroll to zoom.
A massing sketch from the outlines and your building height — not a survey.
No layout yet. Locate the site, then press Compute layout.
Start from the customer's bill
Live PVGIS for the site (any point in Ghana)
PVGIS-SARAH3 with ERA5 temperatures and a DEM horizon, 14 % system loss, cached 30 days; falls back to the city table if the JRC service is down.
Battery & outage backup sizing
Enter the kWh from each month's bill. January first.
Paste the export, or choose a file. Two columns: a timestamp and a value. A cumulative meter register is detected and differenced; kW is multiplied by the interval.
Twenty-four fractions or kW values, midnight first, comma or space separated. They are normalised.
Enter a roof area or target size and press Calculate solar.
Dust, the harmattan and when to wash the array
Dust lands every day and rain washes it off. How much it costs you depends on your
rainfall, so it differs sharply between the coast and the north. Enter what a cleaner charges and
the tool works out the interval that costs least — it will not guess that price.
Borrowing for it: debt service and DSCR
What a bank reads: the cash the system frees each year against the loan repayment.
Rates default to today's Ghanaian average; tenor and debt share are assumptions — use the offer.
Measured against modelled: how an installed system is really doing
Paste what the inverter actually produced — twelve monthly kWh figures (Jan to Dec,
comma-separated) or an export file — and the tool compares it with what the model predicts for
the same system. Months with too little data are shown but not judged.
Enter a roof area and press Assess green roof.
Quantities come from the layout (modules, rows, perimeter) and the battery sizing. Every unit price is sourced, an explicit assumption (a share of the one sourced Ghana benchmark), user-entered, or missing (quantity shown, no money). Overwrite any price with a supplier quote.
Price book (GHS) — edit to override
Loading…
Fill the quantities and press Compute bill of quantities.
Screening of the IFC EDGE certification levels (Certified 20/20/20 · Advanced 40 % energy · Zero Carbon = Advanced + 100 % renewable offset). PV generation, green-roof area and rainwater harvest are pulled from the other tabs; enter the building's other EDGE App measures where known.
Enter the building and press Screen EDGE credits.
Each roof face gets its own view and is laid out in the plane of the roof, so the areas are the real surface you cover, not the foreshortened plan. Nothing here needs satellite imagery — enter what you measured with a tape and an inclinometer.
Use a module that is not in the list
Fill Wp, length and width to override the catalogue. Clear the Wp field to go back.
Click the sketch to place an obstruction; drag one to move it. Bearing and distance follow from where you drop it.
Bearing is a compass bearing from the middle of the eave: 0° north, 90° east, 180° south. Heights are above the same ground datum as the eave. In Ghana the noon sun is north of overhead for about five months, so a tree to the north matters.
Needs the shading above and the stringing below. Modules in series carry one current, so a string either bypasses its shaded modules or throttles its clear ones — which modules share a string changes the yield at no cost.
Enter the module datasheet (recommended before ordering)
All four of Voc, Vmp, Isc and Imp must be filled to override the class-typical defaults.
An integrated RCMU is not one of the three exceptions in IEC 60364-7-712 cl. 712.530.3.101 — only simple separation, or the manufacturer's own instructions, relieve the Type B requirement.
Build a roof from a preset, import one from the map, or add faces by hand — then press Lay out every face.
Knowledge centre
How the tool works, which standards it applies, what its numbers
are worth and where it refuses to answer. Generated from the engine itself, so it cannot drift
out of step with the code.
Loading…
Every Ghana number the engine uses, with its status. sourced = primary/credible source with date · verify = transferred or unconfirmed · assumption = explicit placeholder. Confirm the flagged ones before client use.
Loading…
Money: every published Ghana price behind the bill of quantities